Development Projects/Environmental Info

Development Plan Review 24-12 and Tree Removal Permit 24-23 consist of the construction and operation of a single building encompassing 129,089 square feet of light industrial and warehouse uses with flexibility for logistics uses, such as a distribution and non-sort fulfillment center or cold storage, and including 8,000 square feet of office space (see Figure 2). The building would be oriented with the office space located along the northern West Cienega Avenue frontage. Seventeen dock doors would be located along the building’s western façade. Automobile parking would be provided along the building’s eastern façade, as well as in the southwestern portion of the site. A total of 78 automobile parking spaces would be provided. In addition to the construction of the proposed warehouse, the Project will also include the removal of 57 mature trees and the demolition of a single-family residence on the City’s historic resources survey.
Project Location:
The Project site is located at 914 W. Cienega Avenue in the City of San Dimas, in Los Angeles County, California. At the local scale, the Project site is located north of West Covina Boulevard, south of West Cienega Avenue, west of State Route 57 (SR-57), and east of South Lone Hill Avenue (see Figure 1, Vicinity Map). The Project site encompasses approximately 7.5 acres consisting of Assessor Parcel Number (APN) 8385-006-041.
Document Availability:
Copies of all relevant material, including the project specifications, are available for public inspection at San Dimas City Hall, Planning Division located at 245 E Bonita Avenue, San Dimas, and on our website. Please click the links below to view the documents:
- CEQA Notice of Preparation
- Conceptual Site Plan
Public Scoping Meeting:
A public meeting will be held to provide information on the Project, explain the CEQA process and receive public comment regarding the scope and content of the environmental analysis to be included in the Environmental Impact Report (EIR).
Day & Time: Thursday, October 30, 2025, from 6:30 p.m. - 7:30 p.m.
Location: Stanley Plummer Community Building
Notice of Preparation Review and Comment Period:
The NOP review and comment period is from October 15, 2025 through November 13, 2025. The City will consider all written comments regarding the scope of issues to be addressed in the Draft EIR. Due to the time limits mandated by State law, please submit written comments at the earliest possible date but not later than 4:30 p.m. on the last day of the NOP comment period. In your comment, please include the name of a contact person. Please direct written comments to:
Mail: Marco Espinoza, Planning Manager
City of San Dimas
245 E Bonita Avenue
San Dimas, CA 91773
Email: planning@sandimasca.gov
Municipal Code Text Amendment 20-0005; Specific Plan No. 11
Project Description:
The Project Site is located within the southwestern portion of the City and is located within Specific Plan-11. Specific Plan-11, Area I is bordered by Puente Street to the north, Via Verde to the southeast, East Covina Hills Road to the southwest and the City of Covina to the west. The majority of the Specific Plan has been developed with single-family residences within hillside areas and is surrounded by existing hillside single-family residences. Local access to the Project Site is provided by Via Verde and regional access is provided by the San Bernardino Interstate-10 (I-10) Freeway, approximately 1-mile to the south.
Copies of all relevant material, including the project specifications and all documents referenced in the Mitigated Negative Declaration, are available for public inspection at San Dimas City Hall, Planning Division, 245 E Bonita Ave, San Dimas, and the City’s website. Please click on the document links below:
October 2024 Final Initial Study/Mitigated Negative Declaration
Final Initial Study/Mitigated Negative Declaration
- Appendix A - Previously Circulated Draft IS/MND (December 2022)
- Appendix B - Biological Technical Report (January 2024)
- Appendix C - Recirculated Draft Initial Study/Mitigated Negative Declaration (June 2024)
- Appendix D - Mitigation Monitoring and Reporting Program (October 2024)
June 2024 Recirculated Mitigated Negative Declaration
CEQA Notice of Intent to Adopt Recirculated Mitigated Negative Declaration
CEQA Notice of Completion
Recirculated Draft Initial Study/Mitigated Negative Declaration
****Note: Please see Appendices listed below in the December 2022 Mitigated Negative Declaration.
December 2022 Mitigated Negative Declaration
Public Hearing Notice
CEQA Notice of Intent to Adopt a Mitigated Negative Declaration
Draft Initial Study/Mitigated Negative Declaration
Technical Studies
- Appendix A - Planning Area I Lot Coverage
- Appendix B - Air Quality & Greenhouse Gas Emissions Data
- Appendix C - Biological Resources Evaluation
- Appendix D - Cultural Phase I Report
- Appendix E - Fuel Consumption Analysis
- Appendix F - Paleo Records Search
- Appendix G - Hydrology Drainage Report