Current Projects
Project Description:A new 735 square-foot standalone, kiosk-style coffee shop (Black Rock Coffee Bar) with a double lane drive-thru that can queue up to 16 vehicles, in association with an updated shared parking agreement and a tree removal request located in Specific Plan No. 18, Area III (SP-18, Area III) zone. The site is designed as a walk-up and drive-thru service only (no seating) and incorporates faux Spanish-style design elements.
Project Location:
The project site is located at 1010 W. Arrow Highway (APN: 8383-020-070) within Family Fitness Plaza. It is situated at the southeast corner of the W. Arrow Highway and S. Lone Hill Avenue intersection, just west of El Pollo Loco and east of Walgreens. The site is currently an underutilized parking lot that serves the existing center.
Environmental Review:This project is Categorically Exempt under CEQA guidelines, Title 14, Article 19 Categorical Exemptions, Section 15332, In-Fill Development Projects, Class 32.


164 Unit Condominium Project located behind 464 E. Bonita Avenue
Project Description:
Project Location: The Project Site is Located just East of 444 E. Bonita Ave. (APN’s: 8390-016-008 & 8390-014-025) on a portion of land that was previously owned by the U.S.D.A. Forestry Service Technology and Development Center
Environment Review:



Proposed Single Family Homes located at 901 W. Covina Boulevard
Project Description:
A Tentative Tract Map to subdivide one (1) existing parcel into 19 new parcels (TTM 84582) to be developed with a total of 37 detached two-story single-family residences, which include seven (7) affordable housing units in compliance with Density Bonus Law, and the demolition of two residences, garage, barn, and the associated removal of 40 mature trees. There will be three (3) different floor plans and all will be two-story residence built in either a Spanish style, Prairie style, and Farmhouse style architecture. The residencies will range from 1,812 sq. ft. to 2,197 sq. ft. of living space and all will have a two-car garage; with an average lot size of 2,800 sq. ft. The project is currently under construction with the first homes expected to be completed Fall 2027 and total project completion Summer 2028.
Project Location:
901 W. Covina Boulevard (APN: 8385-006-027)
Environment Review:
The proposed project is Categorically Exempt under CEQA guidelines, Title 14, Article 19 Categorical Exemptions, Section 15332, In-Fill Development Projects, Class 32.

Proposed Development of 7 Detached Single-Family Residences on Cherokee Court
.jpg?t=202610021435420)
Project Description:
A subdivision of two existing parcels into seven new parcels to be developed with seven detached single-family residences. The project includes amending the General Plan designation of the two parcels from Single Family Very Low (0.2 – 3) to Single Family Low (3.1 – 6), change the Zoning of the two parcels from (SF-A16,000) to (SF-7,500), and remove 11 mature protected trees. The new residences will be two stories but include two floor plan options, each available in either a Spanish or Italianate architectural style. The project is currently under construction with the first homes expected to be completed by Summer of 2027 and total project completion by the end of 2027.
Project Location:
The development will be located at 327 E. Baseline Road in addition to the vacant lot directly to the north (APN’s: 8661-017-010 & -011). These parcels are generally situated along the northwest corner of E. Baseline Road and Cherokee Court.
Environment Review:
The proposed development is a project pursuant to the California Environmental Quality Act (CEQA) and an Initial Study was prepared to determine possible environmental impacts. On the basis of the Initial Study, which indicated that all potential environmental impacts from the project were less than significant or could be mitigated to a level of insignificance, a MND was prepared pursuant to CEQA guidelines. The MND subsequently underwent the appropriate review process, public review period and final adoption by the City Council.



Industrial Building at 914 Cienega Avenue
Project Description:
Development Plan Review 24-12 and Tree Removal Permit 24-23 consist of the construction and operation of a single building encompassing 129,089 square feet of light industrial and warehouse uses with flexibility for logistics uses, such as a distribution and non-sort fulfillment center or cold storage, and including 8,000 square feet of office space (see Figure 2). The building would be oriented with the office space located along the northern West Cienega Avenue frontage. Seventeen dock doors would be located along the building’s western façade. Automobile parking would be provided along the building’s eastern façade, as well as in the southwestern portion of the site. A total of 78 automobile parking spaces would be provided. In addition to the construction of the proposed warehouse, the Project will also include the removal of 57 mature trees and the demolition of a single-family residence on the City’s historic resources survey.
Project Location:
The Project site is located at 914 W. Cienega Avenue in the City of San Dimas, in Los Angeles County, California. At the local scale, the Project site is located north of West Covina Boulevard, south of West Cienega Avenue, west of State Route 57 (SR-57), and east of South Lone Hill Avenue (see Figure 1, Vicinity Map). The Project site encompasses approximately 7.5 acres consisting of Assessor Parcel Number (APN) 8385-006-041.
Document Availability:
Copies of all relevant material, including the project specifications, are available for public inspection at San Dimas City Hall, Planning Division located at 245 E Bonita Avenue, San Dimas, and on our website. Please click the links below to view the documents:
- CEQA Notice of Preparation
- Conceptual Site Plan
Public Scoping Meeting:
A public meeting will be held to provide information on the Project, explain the CEQA process and receive public comment regarding the scope and content of the environmental analysis to be included in the Environmental Impact Report (EIR).
Day & Time: Thursday, October 30, 2025, from 6:30 p.m. - 7:30 p.m.
Location: Stanley Plummer Community Building
245 E Bonita Ave San Dimas CA 91773
909.394.6200